Roof & exterior
Care for James Hardie / fiber-cement siding
Gentle cleaning and attention to paint and sealant help protect the finish and keep water out of the wall assembly.
Recommended timingEvery 6–12 months
What to do
- Clean every 6–12 months with a low-pressure garden hose and soft or medium nonmetal brush, working in small sections.
- Do not use a high-pressure washer, hard metal brush or abrasive sponge.
- Inspect paint, fasteners, butt joints and sealant at trim, penetrations and material transitions.
- Keep gutters working and sprinklers, soil, mulch and vegetation from holding moisture against the siding.
- Use compatible repair and touch-up products specified for the installed finish.
Official guidance and sources
Product instructions and local requirements take priority for the equipment or material installed at your home.
